Installation

Engineered for a clean install.

Designed to be installed by any qualified kitchen fitter. No specialty equipment. No proprietary tools. Just clean, considered engineering.

A typical install in four steps.

01

Measure & Mark

Your fitter confirms the position and clearances under your counter.

02

Mount the Module

The unit is bracketed to the underside of your countertop.

03

Connect Power

Standard 220–240V single-phase supply, wired by a certified electrician.

04

Calibrate & Test

Touch zones are mapped, sensors verified, and the system is handed over.

Documentation

Full technical drawings & spec sheets.

CAD files, electrical schematics, fitter handover checklist — everything your installer needs.